Mono Stringer Floating Staircase Factory Trial Assembly
For a Residential Project in Greenwich, Connecticut, USA
For a Residential Project in Greenwich, Connecticut, USA
This project included four individual staircases with different stringer components. During the factory trial assembly, Demax identified that one set of stringer components had been temporarily installed on the wrong staircase due to component mix-up during the initial assembly process. The issue was discovered during the assembly inspection and promptly corrected. This trial assembly process helped ensure that all staircase components were correctly matched and ready for site installation.
This staircase project included glass railings supported by glass standoffs installed on each tread. During factory trial assembly, the glass panels were temporarily installed to verify that the pre-drilled holes aligned accurately with the fixing points on each tread.
This fitting check helped confirm the coordination between the glass panels and staircase structure before shipment, reducing potential alignment issues during on-site installation.